MSiM
for Port Operations
180-Day Terminal Scenario
SIM TIME
Day 0.0 / 180
BERTH STATUS
B-1
EMPTY
B-2
EMPTY
B-3
EMPTY
B-4
EMPTY
CRANE STATUS
C-1
IDLE
Run: 0.0 h · Risk: 0.00 %/hr
C-2
IDLE
Run: 0.0 h · Risk: 0.00 %/hr
C-3
IDLE
Run: 0.0 h · Risk: 0.00 %/hr
C-4
IDLE
Run: 0.0 h · Risk: 0.00 %/hr
YARD OCCUPANCY
1,000 TEU · 20%
Vessels at anchor
0
Gate throughput
0 trucks/hr
Crane productivity
0 moves/hr
OPERATIONAL PHASE
NORMAL
Full capacity — all berths open
CONGESTED
Yard >60% — gate boosted
DEGRADED
Yard >80% — vessel limits
SHUTDOWN
Yard >95% — port closed
RECOVERY
Clearing backlog — partial ops
Full capacity — all berths available
NORMAL
EVENTS
⏸ Pause
↺ Reset
Speed
2×
Disruption Severity
MED
PREDICTED TRENDS
BERTH UTILISATION
—
YARD OCCUPANCY
—
CRANE RISK
—